Saturday, June 11, 2011

The Move





Alhamdulillah, we have officially moved in to our own home. The home which we have been lovingly furnishing since early 2010. We are very tired but happy. As I mentioned before, this is the first stage. There are still more things at my parent's place. We'll move them over slowly. Ok, I've got to go now. Will blog again later.


- Posted using BlogPress from my iPad

Tuesday, June 07, 2011

Operation Kindy and Move In - Updates

From my previous entry, I had set the three missions to be completed by this week. As of today, which is 4 days to moving-in day and 6 days to Maisarah's first day at kindy, these are the updates:

Mission 1: to get Maisarah fully potty trained.

Maisarah still refuses to poop on the toilet. She says if she sits on the toilet it won't come out. We have told her countless times that at school she will not be abel to wear the diaper when she wants to poop. To which she replied 'Ok, kat sekolah Maisarah b3rak kat potty'. So, we'll just wait and see.

Mission 2: to mentally prepare Maisarah for school and being separated from my mom and Kak Som (my mom's maid).

We have been mentally preparing Maisarah for school. She seems very excited every time I say she will be going to school next Monday and meet new friends and teachers. But I forgot about the part on being separated from my mom and Kak Som. I think Maisarah knows that my mom and Kak Som will not follow us to our new home. My mom and dad have been asking her what will they do when they miss her and she says 'You can come to my house and visit.' In any case, I don't think the separation will be much of an effect on Maisarah as it will be on my parents and Kak Som. They will surely feel Maisarah's absense because the house will be quiet. Even so, we will still be frequenting my parents house every weekend in the next month or so to complete the move.

Mission 3: to start packing and moving into our own home

We have decided to move our things in stages. The first stage, which is this weekend, will involve moving our daily clothes, shoes, and daily necessities. These are all almost packed. The next stage will be Maisarah's toys, our books and clothings which we seldom use (such as older clothes, special occasion / kenduri clothes and Maisarah's babywear). The final stage will hopefully be our boxes of stuff from the UK, our 9-year old wedding presents and Maisarah's study table. Now that is just the move-in, the unpacking will involve more stages as we currently have not much space for storage. So most things will still remain in boxes for quite some time.

Anyway, I am all excited to move in to our own home. Just the three of us and not to forget, Maisarah's pet turtles will be coming too. I initially planned on leaving them at my mom's place until we were settled and I have gotten a proper table to put them on. But that plan was overruled by Maisarah. She said we can always put them on the coffee table or even the dining table. So, if any one drops by our house in the next few days, you will be served with tea and turtles for snacks.

Thursday, May 19, 2011

Operation Kindy and Move In


It's now confirmed that Maisarah will go to school starting 13th June. Shah and I have decided to enroll her in CIC at the Putrajaya Precint near our office instead of waiting for her to be moved up from the waiting list at Sri Ayesha. Alhamdulillah, both of us find that the kindy where Maisarah will be going looks clean and has nice teachers. We really hope Maisarah will like the kindy and we plan on bringing her to see the place one of these days. Our only concern now is that Maisarah still asks to wear the diaper when she wants to poop.

With Maisarah starting school in June, we also need to start moving our stuff to our own home, little by little. I've really got to dig into my mom's storeroom this weekend and find our boxes from the UK. I'm sure they are burried deep inside the store since the store would have accumulated more stuff (or is it junk?) over the last six years since we shoved in the boxes. So, I need to physically prepare for the tough work and put on proper clothing plus a mask while rummaging through the store. Or else, the dusts will upset my sinuses and make me sneeze non stop, cause my eyes to water and my skin to itch.

So, our mission in these next few weeks are -

Mission 1: to get Maisarah fully potty trained.
Mission 2: to mentally prepare Maisarah for school and being separated from my mom and Kak Som (my mom's maid).
Mission 3: to start packing and moving into our own home



With these missions laid out, let's now begin Operation Kindy and Move In!

Wednesday, May 18, 2011

Wordless Wednesday: Soon

Not long to go till we make full use of our own home, insyaAllah.

Friday, January 07, 2011

Project "Our Hive": Home Security

Ok, it's time for some updates on the house. The last time I wrote, I mentioned that the furnitures were coming in and indeed they were. Although there was a small hiccup with the delivery for the bed in our master bedroom. The hiccup was sorted last Friday, on the last day of the year 2010. Shah and I ended the year 2010 by spending the whole day at the new house. My mom told us that it is good to recite the whole Surah Al-Baqarah when first moving in to a new house. So, Shah recited the whole surah while I recited the surah Yassin. Hence, with this, we pray that Allah will bless our home and protect us from harm. However, as Allah has always reminded us, we must do our part (i.e. ikhtiar) and not just leave it all to Allah (i.e. tawakkal). Thus, to help us protect ourselves, we think that a home security system is a necessity.


Picture from ADT

So, we have decided that we will go with ADT for our home security system. ADT's main business for home security is in the monthly Customer Monitoring System by which they will monitor our house whenever there is an alarm due to burglary. They will call us and enquire on whether it was a false alarm or if there is actually a burglar in the house. If they are unable to speak to us after caling twice, ADT will immediately contact the local police station.

The system also has a panic button and also emergency buttons for fire and ambalance. So if there was a fire in the house or an accident, we just have to press the button and they will call us to verify the emergency before helping us to contact the nearest fire brigade or ambulance. Another feature which Shah and I think is very useful is the 'Duress' monitoring. Let's say a burglar comes in and forces us to disarm the alarm, then we can use the Duress code to disarm the alarm. ADT will immediately be alerted that we have entered the Duress code by force because it is different to the normal disarm code. Therefore, they will immediately call the police.

For comprehensive security of a regular terrace house, the Safety Advisor recommends the ADT Home Saver 3 package of RM 1786 which includes a smoke detector, 12 window vibration or door sensors, 2 motion detectors, an indoor siren, 2 keypads, the control panel and back-up battery. The one-off installation charge is RM 299. ADT's profit mainly comes from the monthly payment for the Customer Monitoring System which will costs RM 75 per month for a contract of 3 years. ADT also has two othe Home Saver packages which cost RM 650 and RM 1670 but they will provide less number of burglar detection points for the house.

Shah and I think that in the world we are living in now, investing money on a reliable home security system is worth every penny. It is better to be safe than sorry.

Friday, December 17, 2010

Project "Our Hive": Furnitures Coming In

Sorry for the lack of entry here as I am currently focusing on a project which requires lots of research. I'll let you know more on the project once I am satisfied with the content.

Anyway, last few weeks Shah and I have been busy searching for furnitures. We managed to get a bedroom set for our room and a six-seater dining table. We chose a white bedroom set so as to complement the pale blue bedroom walls and silver curtains. I think that a dark coloured set would dampen the brightness of the room. As for the dining table, we opted for a four-foor round table which seats four persons. The table can be extended to an oblong shap which them fits six persons. We also think it can squeeze a party of eight people but we'll have to try that out for real later on. Last weekend, we also went to the electrical appliance store to settle the payment for the fridge and waching machine which we choose during Homedec earlier May.

We have arranged for all items to be delivered this afternoon. So I am very excited to see how our bedroom and dining area will look with the furnitures in place. With this, the dining and living room area will be settled. All I want to get next are some mirrors to brighten the room and maybe a sideboard to be placed near the dining table, if there is any extra space. But I'm not in any rush to get those unless I fall in love with a particular mirror or sideboard and have to have it pronto.

Well, that's all the update for now. I've got to get ready to head over to our house. Bye!

Saturday, November 13, 2010

Project "Our Hive": Living + Dining Room Colour Scheme

The first item we bought for our living room was a leather sofa in dark brown followed by a black TV cabinet. With those items, it was pretty much a done deal that the furniture in the living and dining rooms were mostly going to be dark pieces. To suit the dark pieces, a neutral colour scheme was chosen for the living and dining area with the main colour being tones of brown and beige or cream with accents of red. I added the red into the mix in order to bring continuity to the kitchen cabinets. The inspiration for the colour scheme actually came from the first Ariani headscarf I bought. The colours on the scarf are very much similar to the group of colours shown in the second picture (obtained from google). After having set the colours to be used, I googled for living room ideas and I was ecstatic to have found the picture above. The colours and dark furniture totally represents what I was imagining in my head down to the red accents on the curtain and cushions. I even imagined having a lamp with a red base in the room. So, I'm working my way to get a room that looks something like this.

Currently our living-dining area is already painted in the same cream colour and we've already got the sofa, albeit both are in a slightly darker tone to that in the googled picture. Our curtain is different though. I was gutted that we couldn't find a fabric with red accents when we shopped at Baagus. So I settled for fabric in a lighter shade of brown with gold undertones and a dark brown border and embroidery. What we need to get next are the dining table and a light-coloured floor rug. Then we're just left with getting cushions in cream with red highlights and wall hangings. I also need to brighten the room more so I'll add a huge mirror in the dining area to reflect the light.

I so can't wait to get the living and dining rooms done. I wish I could just concentrate on furnishing the house and not have to work. But that will not happen unless money grew on trees. So, I'll update more when I'm finally done.

Friday, November 12, 2010

Project "Our Hive": The Kitchen

It's been too long since I updated this blog on our home. The last time I wrote about the house was on the day our kitchen cabinets were being installed which was last July. The designer from Kian Classic told me that the installation would take one day but it turned out that they had to continue the next day. Unfortunately, after two days, the cabinets were only 85% completed because the following were yet to be installed:
  1. One of the doors above the cooker hood.
    It had some defect and they had to take it back to the factory.
  2. The solid surface countertop.
    As I was told by the designer, the actual measurements for the countertop can only be taken after the cabinets are installed. This is to make sure that the top perfectly fits on top of the cabinets. So the countertop was only installed a week after the cabinets were fixed.
  3. The kitchen sink.
    The cabinet installers were not plumbers so they could not fix the free sink and tap given. So, we had to arrange for the Kian Classic plumber to come another time.
During this time we were constantly coming to the house and waiting for these people to turn up. Mind you these contractors are not really punctual. We sometimes had to wait more than an hour for them to arrive. So, Shah was already getting annoyed with me for not arranging everything to be installed at the same time. To appease Shah, I arranged for the cabinet door replacement to be fixed on the same day the kitchen appliances were to be installed which was in August. That way we could have everything fixed at the same time.  We also had another hiccup related to the kitchen. The designer made some wrong calculations on the side where the fridge was to be placed. The divider for the fridge was placed exactly where the socket points were. So, we had to get an electrician to shift the sockets to accomodate the divider.

Anyway, these are some points you should do when designing and installing your kitchen cabinets so that you won't have to put up with all the hassle like I did.
  1. Make sure the designer takes proper measurements of your kitchen and takes extra measurements on the position of the kitchen sink inlet, outlet and all socket points.
  2. Arrange for the contrators to come on the same day and remind them to be on time.
  3. Be sure to have the cooker hood contractor come over to assess your kitchen before finalising the cabinet design.
So, before I leave you, below is the drawing of the designed kitchen cabinet before we finalised the countertop to be in white.


Now, these are pictures  of our completed kitchen withn appliances. The only aplliances left to put in is the fridge and microwave oven. Our ducting was supposed to be hidden inside the top wall cabinets but due to the presence of a beam at the corner where the cabinet ended, the ducting had to be exposed. My mistake since I didn't get the contractors to come survey the kitchen before the design cabinet was finalised. Even with all the hiccups, I am very much satisfied with the workmanship and I can't wait to use the kitchen.


Friday, July 23, 2010

Project "Our Hive": Kitchen, Wardrobe and Curtains



Since Thursday we have been at the house to supervise the installation of our kitchen, wardrobe and curtains. Two of the three are done. Tomorrow they will continue with the kitchen. We are both tired, Shah especially. He has been sick since Thursday. Words cannot express how grateful I am to have a hubby like him. Thanks Abang for being there and doing lots of cleaning even when you're sick. In return, I will massage your legs and feet every day ok?

Sunday, July 18, 2010

Project "Our Hive": Scrub and Clean

Shah and I spent this morning cleaning the house. Well, half of the house since we only cleaned the ground floor. We started with the kitchen because the cabinets will be installed on Thursday. I can't wait to see how it will turn out. I'm just praying that it will be nice.
Next week we'll be at the house on Thursday and Friday because our wardrobes will also be installed. I also managed to arrange for the curtains to be put up on Friday. So, on Thursday, Shah and I will have to clean the rest of the house.
I am super excited to see the kitchen, wardrobe and curtains being placed. By end of Friday, insyaAllah, the house will no longer look bare. Then, what's left is getting the furnitures moved in. It seems that our home renovation and furnishing project is almost done. But it won't be over soon, there are still smaller things to be done. So, we'll just go with the flow.
Pictures are of the drawing of our kitchen and the actual samples of the doors. Although, in the finalised design the worktop will be white in colour. Please, Allah, let it turn out nice!

Saturday, July 03, 2010

Project Our Hive: Last Big Job

We started off with renovating the yard and fixing the grilles. This was followed by wiring works and adding cornice to the living and dining room ceiling. Next, we had our kitchen cabinets designed. But we couldn't finalise the design because it required repositining of the kitchen sink plumbing. So the plumbing work was what we did next, together with painting the rooms. Once the painting was done, we moved on to lighting and window dressing.

Now here we are, six months after the yard renovations. Tomorrow, insyaAllah, we are going to finalise the kitchen cabinet and master bedroom wardrobe. This will be our biggest investment for the interior of our home. Hopefully the cabinets and wardrobe can be installed by the end of this month. That will mark the last of the major renovation/furnishing work. Then we can finally drape the window dressings we chose a few weeks ago, the kitchen appliances can also be installed and the furnitures can be delivered. But before that, some time in the next few weeks, we've got to clean and scrub the house from top to bottom. So, let's get our cleaning gear and start scrubbing!

P/S: I'm so in love with the black fan we chose for the living room.

Friday, June 11, 2010

Project "Our Hive": Colours Brighten Up Our Home

Thousand apologies for not writing here for ages. These past few months I have been bogged down with work while finding time to settle our home renovations. Speaking of home, I just realised that the last time I jotted down our progress here was more than 3 months ago. At that time we had just finished all construction and wiring works and we had moved on to the interior design, in particular the kitchen. I thought that the kitchen would be installed by the end of May but I was overly optimistic.

It turned out that our kitchen designed required us to get the kitchen sink repositioned. After a few weeks being busy with work, we only managed to get a contractor to do the repositioning at the end of April. We also asked the contractor, Mr L, to put up a brick wall at part of our front fence and to paint the living room and all bedrooms. The decision to paint the walls was not in our initial plans but I felt that a white house looked kind off boring.

So, two weeks ago, I finally made up my mind on the colour scheme and we went to buy the paints. We decided to go with Ni*ppon Odour*less in Classic Silk (brownish beige) for the living plus dining room, Pink Camellias for Maisarah's room (this was her choice), Blue Trace for the guest room and Blue Trace with Parlour Blue feature wall for our room.

Anyway, the paint work is done. The front fence brick wall is up but our kitchen sink is yet to be repositioned correctly due to some miscommunication. I'm hoping it will be done by next Wednesday when our lights and fans are to be delivered and installed. Yup, we've bought our lights/fans at Ten*Gro Lighting in Pu*chong last Wednesday and we got 30% discount on all lights from the booking we made during the Home*dec Fair we attended last April.

And today, our master bathroom shower screen was installed. This was also bought during Home*dec. I'm really loving the shower screen! We also have got our windows measured so we'll be dropping by Baa*gus Curtains in Cheras soon to finalise our window dressings. Our last major work to be done is the kitchen. I'm now aiming for the cabinets and our wardrobe to be installed by mid July. Then we just need to get all furnitures and appliances in before we can move in. It sounds simple but you'll never know what else can happen.

So, I'm praying hard that there will be no more delays. Anyway, above are pictures of my shower screen (please ignore the dirt in the bathroom), a snapshot of the Pink Camellia walls in Maisarah's room and our Parlour Blue feature wall. I'll update more once our lights are installed. I can't wait for next Wednesday!

Sunday, May 02, 2010

Hitching a Ride to Home*dec

Yesterday was Maisarah's first outing to KLCC. The main reason we went there was because Maisarah's mommy wanted to go to the Homedec 2010 fair at the KL Convention Centre. I was hoping to get some furniture for our house. We ended up getting electrical appliances for the house and vouchers for lighting. So, we've got to head to the lighting shop in Puchong and choose lights and fans we want and get 30% discount on all our purchases.

We've got the same concept of vouchers with discount on curtains which we got in the Perfect Livin' fair we went to earlier this month. So, roughly we're 80% done with our kitchen (design to be finalised next wednesday, all appliances bought except for microwave). All bathrooms are also settled except for lightings. The living room is almost done. We just need to settle the dining room and bedroom furnitures.

Before we finalise the curtains, I'm planning to paint the living, dining and bedrooms. So, next week I'm going to ask Shah to take me to the paint shop to buy paint. Hopefully, we'll be able to sort everything out before end of June when the appliances and furnitures are scheduled to be delivered.

Anyway, after spending a fruitful one and a half hour at Homedec, Maisarah asked for lunch at KFC. Then, she had fun playing on the Barney car as seen in the picture above. Soon after her ride in Barney's car, we headed home.

Sunday, March 28, 2010

Project "Our Hive": The Heart of Our Home

Now that all the renovation work are done, we have bid farewell to Mr Peter. We've moved on to the heart of a home, which is the kitchen. Our kitchen designer, Ms S was supposed to come measure our kitchen last Friday but she was unwell. So, we've shifted the appointment to Monday afternoon.

Once she's got all the measurements, then the designing can start. However, she would need the measurement of the appliances that will be fitted to our cabinets - the cooker hob, oven and hood. The company that will do our kitchen supplies Te*ka, Fa*gor and Rin*nai appliances. After reading through the forums, many said that we should go with Asian manufacturers since our Asian cooking uses lots of oil. So, I was leaning towards Rin*nai and Fu*jioh. My mom uses Fu*jioh and also based on reviews on the net Fu*jioh hoods has higher oil absorption efficiency than Rin*nai.

Equipped with all these info, Shah and I headed to the Modern Ho*me and Life*style Fair at Mid*valley today. Alhamdulillah Fu*jioh had a booth there and there were a few reasonable offers. Suffice to say, I was already set on getting a Fu*jioh hood and hob. We also got an oven to go with it at a price that I had budgeted for. So, we've now got the measurements for our appliances to be given to Ms S.

Hopefully we'll be able to finalise the kitchen design in the next two weeks. Then we've got to get the Fu*jioh people to come measure the ducting for the hood and hack a hole on the back wall of the kitchen where the ducting ends. Once the hole is done, then only can the cabinets be fixed and finally the appliances.

So, maybe by early or mid May will the kitchen be ready. In the mean time, we'll be shopping for lights. Just before the cabinets are in and the lights are all fixed, we've got to do the first round of cleaning for the whole house. The proper clening will be done just before we move in the furniture.

Oh, and it looks like the developer is almost done with our complaints. Maybe next week they'll call us up to check the repairs. I've also put a picture of our grille and the simple cornice we've got on the ceiling. So, our main mission at the Mid*valley fair was accomplished. Next week there'll be a Per*fect Li*ving Fair at PWTC and it looks like that fair will be big. So, we'll be there next Saturday to look for lights, furniture and maybe an alarm system for our house if budget permits. We must always ensure safety comes first!

Thursday, March 18, 2010

Project "Our Hive": Wired and Plastered Up

Peter, our contractor, informed us on Monday that the wiring works are completed. Today he mentioned that the plaster cornicing are almost done too. This means that the major renovation works to our house are mostly completed. With that, Shah and I took leave yesterday to inspect the work done. Then, we headed to The Cur*ve on our quest to kick-off the next phase which is the kitchen cabinets.

We went to Ki*an Classic's showroom there because I wanted to see if their '3 Rooms and 2 Halls' package (3R+2H) was still on. This package includes kitchen cabinets, a TV stand for the living room and 3 built-in wardrobes for the room. They also had a newer package called Golden 2+1 (G2+1) which comprised of kitchen cabinets and 2 wardrobes.

Unfortunately, the designer we met previously wasn't there as her shift starts at 1pm. So Shah and I went to I*kea to kill time and get some decor ideas as well as survey furnitures. While browsing, we decided that the 3R+2H package was too much. Our main aim was to get the kitchen done and the wardrobes for our room. So went we met Miss S at Ki*an Classsic's after lunch, we asked if we could take the G2+1 package but have both wardrobes in our master bedroom. How happy were we when she said that was ok. You see even with both the 8 feet and 6 feet wardrobes in our room we still had to add an extra 2 feet of wardrobe space.

So, suffice to say, we have placed the booking for a high gloss kitchen cabinet with additional solid surface worktop and 10 foot built-in wardrobe. Next week Ms S will come over to our house to take measurement and then do the 3-d drawings. Once we agree with the plans, it would take 3 weeks for the cabinets and wardrobe to be installed. InsyaAllah, we hope to get these done by end of May. But we can't install them until the developer has completed work on our complaints which we submitted more than 2 weeks ago. I've got to give them a call and chase them on this. But our complaint were a quite long list as we have some leaks on the ceiling and cracks high up the walls.

Anyway, with the kitchen almost sorted, we'll next move on to the next phase of lighting up the house.

P/S: I've got to take pictures of the house the next time we go.

Sunday, February 28, 2010

Project "Our Hive": Bricks and Irons Up, Wires Next

I just realized that it's almost two months since I last wrote about our house renovation. At that time we were waiting for a second quotation on the back fence and grilles. Anyway, we decided to go with the first contractor we met, Mr Peter. We met him again on 20th January to choose the wrought iron grille design for the whole house and finalise costs for the grille and putting up a wall at the back fence. It all came up to RM8500. I'm not sure if it is expensive or not but the other contractor quoted roughly around that price too. Mr Peter promised us that the grille will be installed after chinese new year since it takes some time for them to weld the iron and spray paint it.

So, last Friday, 26th February, Mr Peter delivered his promise. The grille for our house is already fixed. The back fence was up much much earlier, about a week after we finalised the deal with Mr Peter. We're very happy with the design of our grille and very satisfied with Mr Peter. Now that we are familiar with him and his workmanship, we have decided to employ him again to do the wiring works on the house and maybe the plaster cornice for the living and dining rooms. Tomorrow we're meeting him to finalise the costs. He mentioned that wiring for additional socket points will cost RM80 while lighting points which require hacking of the wall costs RM100.

We're now into the second phase of the renovation works. Mr Peter estimates that the wiring can be done in a week, so if we add the cornicing work it may take another extra week. In total, about two weeks to complete Phase Two.Phase Three will involve finalising the kitchen and getting the lights and fans. So, I've got the next two weeks to go around kitchen showrooms and get quotations. Shah, lets take leave on one of these days? Or do we need to take more days off from work?

Friday, January 08, 2010

Project "Our Hive": Bricks and Iron part 2

I'm now at Starbucks in Three*Two Square PJ while waiting for Shah to finish Friday prayers. We're on leave today. Earlier this morning we met the first contractor and he gave us some quotations. He also brought us to see one of the houses in our neighbourhood where he has done some renovations, i.e. fixing the grille, walling up the back fence and plaster ceiling. His work looks neat. Anyway, we'll wait for another quotation tomorrow before we make our decision on whom to go with.

With regards to plaster ceiling we're not sure if we want to have one in our living and dining rooms. We might just opt for a plaster cornice around the ceiling. But I would like to have downlights installed in the living and dining rooms. Can we have downlights installed with the current cement rendered ceiling that we have? Hmm...do we really need downlights? Need to ask the contractor later.

In any case, we'll give the contractor the first job of installing the grilles and walling up the fence. If they prove to be good, them we will install new gates and front fence to match the gate. We'll only decide on the plaster ceiling after we have teasted out the house for leaks. Which reminds me I have to get the water connected to the house. Anyone knows how go about doing that? Do I need to call up Jabatan Bekalan Air Selangor?

P/S: I am pretty sure that most entries to come in this blog will be related to our house so please don't get bored with me ok?

Wednesday, January 06, 2010

Project "Our Hive": Bricks and Iron

As a start to making our house habitable, this Friday we have set an appointment with a contractor. We need to get quotations on changing our back fence into a wall, placing grilles on our windows and doors plus changing the front gate.

We like the look of wrought iron grille with the fancy designs so that is what we hope to get. To be on the safe side we have also contacted another contractor to meet on Saturday. Then we'll choose which contractor to go with and hopefully by end of this month the back fence and grille will be ready. Only then can we put in valuable things into the house without fear of theft.

I'm hoping to document or process of furnishing and decorting our home on this blog so please don't get bored ok? Oh, and if you have tips on settubg up the house, please share with me ok? Thanks!

Thursday, December 24, 2009

Things To Look Forward To


We've got the keys to our OWN house. Yeay! Shah and I are very excited and we can already picture ourselves living there. We can't wait to decorate it. But before that we'll have to thoroughly inspect the house for any defects and measure all rooms. Pictures will be posted later. I'll have to go to the house again to take pictures of it using the new camera Shah gave me for my birthday. 

I'm still playing around with the Powershot S90 to familiarise with all the features. It's an upgrade to our old Ixus which I have always wanted. Thanks a lot Abang! I love you!

Thursday, December 10, 2009

The Long Awaited Keys

What keys you ask? Well, the keys to our own house! We got the letter informing of the property handover at the on the last week of November. However, in order to get the keys we had to ensure that the bank had paid the final payment for the house. That started my incescent calls to the developer and CI*MB bank to find out if the bank had made the payment. Almost every other day, for two weeks, I called the developer and the bank but to no avail. The developer was yet to receive the payment. Then earlier this week I was busy attending a conference so no more calls were made. The bank was given 21 days from 18 November to make the payment.

So, yesterday on the last day of the 21 grace period for the bank, I called the developer. They made me wait. Then, good news was conveyed to me. The bank had made payment and we can set an appointment to collect our keys! So, the date has been set for Wednesday 16 December. I am excited and a bit scared at the same time. I can't wait to see the house and start decorating it. But I'm scared as I don't know where to start first. Well, I've got lots of ideas on what I want in my head. Now, I've got to start putting it down on paper and making detailed plans. Yeay! Now, excuse me while I dig out all those home decor magazines and really start choosing.